Friday, August 1, 2014

09 Plaster Production Molds Nº 95




I poured the third piece of the lower leg mold today. I applied the 50/50 soap/water parting agent. I secured the coddles to the molding table with oil-clay. I weighed out the water. I weighed out the plaster. I added the plaster to the water and let it slack. I mixed the plaster, waited until it was ready, then poured it into the coddles. I poured the excess plaster into the lined trash can. I washed off my hands and the mixing bowl in the bucket of water. Never put plaster (dry, set, or wet) down the drain pipes. I leave the poured plaster for at least an hour to set up. Click on the image to enlarge it.






Links To BJD Tutorials




Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 3.0 Unported License.

No comments:

Post a Comment

This is my personal BJD making journal. All comments are moderated. If you make a new comment under an old post, your comment will be published under the old post. I reserve the right to publish or delete any comments made, at my own discretion. Thank you for looking.